About the project

Sony Corporate Buildings

Superior Wall Systems was selected to complete metal stud framing, drywall and rain screen panels. With a project scope including a new central plan, two new office buildings, a 1,100-car parking structure and more than seven acres of site improvements, the flexible open floors, a health facility and a commissary that opens into a new campus park create an open, collaborative environment for all Sony Staff. Designed in the traditional Art Deco style used consistently throughout the studio’s 70-year history—since MGM’s 1938 Thalberg building—the new Sony Lot enjoys distinction as the first major production studio to be LEED-Gold certified.


Architect:

Moules & Polyzoides

GC:

KPRS

Owner:

Sony

Location:

Los Angeles, CA

Let's talk!

Building Connections

We approach every project with a true collaborative mentality. If you're ready to connect with us, send us an email and we’ll be in touch shortly to start discussing your project goals.

Our Full Portfolio

Explore Similar Projects

Our expertise lies in the fields of framing, drywall installation & finishing, lath & plaster, EIFS, fireproofing and prefabrication components. We provide resources and innovative solutions, with an emphasis on safety and quality control, which produce high-quality results.